| |
Wong, A.K.D. and Yau, A.S.K. (1999). Public housing construction in Hong Kong: From building traditionally to the era of rationalization. Group Proceedings: Group 1 -- Construction, The Hong Kong Institution of Engineers (HKIE), 2(1), 11-17.
Prefabrication Methods in Construction
C-Risk. (2001) Construction defect. C-Risk Consultants in Risk Management. Retrieved February 27, 2005 from http://www.c-risk.com/Construction_Risk/CR_CDs_01.htm
Quality Construction
Robinson, Thomas. Television and music video exposure and the risk of adolescent alcohol use. PEDIATRICS Vol. 102 No. 5 November 1998, p. e54. Topics-Magazine: http://www.topics-mag.com.
Television and Cultural Plagues in America
Krauth, K. (2002), Anarchism - Topics & Definitions - Freedom [Internet] Available from: <http://www.hinet.hr/kosta-krauth/topics/freedom.html> [Accessed 4^th April, 2003]
Theory of Negative Freedom
O'Brien, Jeffrey M. "The Bounty Hunter." Wired, September 2003, retrieved January 31, 2004 at http://www.wired.com/wired/archive/11.09/shipwreck.html?pg=1&topic=&topic_set=
Modern Deep-Sea Treasure-Hunting
|
|